Home > Cabling Services
Structured Cabling Done Right
Reliable data and network cabling for schools and businesses across Auckland and Waikato — installed clean, tested, and documented.
Structured cabling means running, terminating, and testing the physical network wiring (Cat5e, Cat6, and fibre) that connects computers, phones, wireless access points, and cameras back to a central switch. This suits schools adding new classrooms or wireless coverage, businesses relocating or renovating offices, and any building where the existing wiring is old, mislabelled, or can't keep up with current network demands.
StratusIT provides cabling services for schools and businesses across the Auckland and Waikato region, including Pukekohe, Tuakau, Drury, and Papakura. Cabling is the physical foundation underneath every other IT service we provide — VoIP phones, security cameras, and school PA systems all depend on solid cabling underneath them. We plan the layout, run and label every cable, and test every point before handover, so what you get is a network you can rely on and trace years from now.
Why Schools and Businesses Trust Our Cabling Work
Every cable tested — every run is tested end-to-end and certified before we sign off the job.
Labelled and documented — patch panels and cable runs are labelled clearly so the next technician (or your own IT contact) can trace anything in minutes.
[INSERT YEARS IN BUSINESS] years serving Auckland and Waikato — placeholder years of hands-on cabling experience across schools and businesses in the region.
[INSERT CERTIFICATION/LICENSE DETAILS] — placeholder for confirmed cabling certifications or licenses once supplied by the client.
How a Cabling Project Runs, Start to Finish
1. Site survey and plan— we walk the building, map existing cabling, and plan new runs around your network and device needs.
2. Cable installation— cable is run through ceilings, walls, or trays with minimal disruption to your school day or business hours.
3. Termination and testing— every point is terminated, labelled, and certified with a cable tester before we call it done.
4. Handover and documentation— you receive a labelled cabling map so future changes are simple, not guesswork.
Most single-building cabling projects run 2-5 working days once started, depending on the number of data points and building access — this is separate from how quickly we can schedule your assessment, which is usually within [INSERT RESPONSE TIME].
We install cabling for schools and businesses throughout Mangatāwhiri, Pōkeno, Mercer, Pukekohe, Tuakau, Bombay, Mangatangi, Meremere, Drury, Papakura, Miranda, Maramarua, Clevedon, and Ramarama.
Cabling costs depend on the building, not a flat rate.
A few factors drive the cost of any cabling project. Here's what we weigh when we quote your job:
Building size and layout — more rooms and longer cable runs mean more materials and labour time.
Cable type required — standard Cat6 data cabling costs less than fibre runs between buildings or high-bandwidth backbone links.
Existing infrastructure — buildings with old or undocumented cabling often need extra time for removal or tracing before new cable goes in.
Access and disruption needs — ceiling access, after-hours work, or working around a live school timetable can affect scheduling and cost.
We provide a fixed quote after the site survey, so you know the full cost before work begins — no hourly surprises.
Recent Cabling Work
[Recent cabling project photos to be added] — real before/after and in-progress photos from completed jobs will appear here once supplied by the client. We do not display stock photography as a substitute for actual project results.
Ready to Fix Your Cabling for Good?
Book a site assessment and we'll map out exactly what your building needs — no guesswork, no oversized quote.
Cabling Questions Answered
Do you work around school hours or business hours?
Yes, we schedule cabling work around your timetable or operating hours where possible, including after-hours or weekend work for schools that can't have classrooms disrupted during the day.Can you cable an existing building without major disruption?
In most cases yes — we use existing ceiling cavities, trays, and conduit where available, and we plan routes during the site survey to minimise wall or ceiling work.What's the difference between Cat6 and fibre cabling?
Cat6 handles standard data, phone, and camera traffic within a building; fibre is used for longer runs between buildings or where higher bandwidth is needed, and we'll recommend the right mix during your assessment.Will my cabling be labelled so I can find things later?
Yes, every cable run and patch panel port is labelled and documented, and you'll receive a cabling map at handover.
Let's Talk About Your Cabling
Whether it's one classroom or a whole campus, we'll plan the cabling around what your network actually needs to do.
Cabling pairs well with our other services — see how it connects to VOIP Phone Systems, Security Camera Installation, and School IT Support. Have more questions? Visit our FAQ.

